This was a project undertaken in Payhembury where the customer had bought a run down mill and wanted it modernised and refurbished throughout. Along with this bathroom there were 2 further en-suites and a wet room installed. Heating wise the customer opted for a mixture of underfloor heating and a traditional radiator heating system throughout the whole property, all heated by a new boiler located in a new plant room.